Toyota Camry owners & service manuals

Toyota Camry (XV70): Inspection

INSPECTION

PROCEDURE

1. INSPECT CAMSHAFT TIMING GEAR BOLT

(a) Check the stroke of the plunger in the center of the camshaft timing gear bolt.

Standard Stroke:

2.2 mm (0.0866 in.) or more

HINT:

When pressing the plunger, there may be a stepped feeling. This is not a malfunction.

If the result is not as specified, replace the camshaft timing gear bolt.

*a

Plunger

    READ NEXT:

     Installation

    INSTALLATION PROCEDURE 1. INSTALL CAMSHAFT TIMING GEAR BOLT (a) Make sure that the No. 1 cylinder is at TDC/compression. HINT: Check that the cutout of the camshaft timing gear assembly is at the

     Camshaft Oil Control Valve (for Intake Side Of Bank 1)

     Components

    COMPONENTS ILLUSTRATION *1 FRONT FENDER APRON SEAL RH *2 V-BANK COVER SUB-ASSEMBLY N*m (kgf*cm, ft.*lbf): Specified torque - - ILLUSTRATION *1

    SEE MORE:

     Clearance Warning Buzzer

    ComponentsCOMPONENTS ILLUSTRATION *A for 7 Inch Display *B for 9 Inch Display *1 CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY *2 CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY *3 LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY *4 NO. 1 CLE

     Removal

    REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during camshaft removal/installation are shown below. Necessary Procedure After Parts Removed/Installed/Repl

    © 2023-2025 Copyright www.tocamry.com