Toyota Camry (XV70): Audio, Visual, Telematics
READ NEXT:
Service DataSERVICE DATA Battery Standard specific gravity
1.25 or higher at 20
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
(a) Install the flow shutting valve (No. 1 water by-pass hose) with the bolt.
Torque: 19 N·m {194 kgf·cm, 14 ft·lbf} (b) Connect the flow shutting valve connector.
(c) Connect the flow shutting valve (No. 1 wa
ON-VEHICLE INSPECTION PROCEDURE
1. INSPECT FRONT LOWER BALL JOINT ASSEMBLY
(a) Check for looseness. (1) Lift up the vehicle. (2) Move the front lower No. 1 suspension arm sub-assembly up and down by hand with a force of 294 N (30 kgf) or more to check that there is no looseness at the front